Skip to main content

Component Locations

Visual reference guide for all EDC components, storage locations, and edition-specific differences.

⏱️ Reference Time: 5 minutes


Overview​

This page provides a comprehensive reference for locating all components within your HiveRadar EDC. Use this guide during setup, maintenance, or when looking for specific items.

What's covered:

  • Front and rear panel components
  • Internal component layout (2 shelves)
  • Storage locations in lids
  • Edition-specific differences (NUC vs HR-01)

Front Panel Components​

When front lid is removed, you'll see:

[IMAGE: Front panel overview with labeled components]

Compute Drawer​

Location: Center, backlit drawer with server nodes

📦 NUC Edition:

  • 3× Intel NUC Pro nodes (side by side)
  • Labeled 1, 2, 3
  • Individual bays with rubber dampening
  • Access via pull handle

🔶 HR01-2 Edition:

  • 2× HR-01 Edge Server nodes
  • Labeled 1, 2
  • Full-depth server chassis
  • Access via pull handle

🔷 HR01-4 Edition:

  • 4× HR-01 Edge Server nodes
  • Labeled 1, 2, 3, 4
  • High-density configuration

Accessing drawers: All drawers (compute and storage) use twist-lock mechanisms on left and right sides. Twist upward ~90° to unlock. For complete drawer operation instructions, see Storage Drawers.

[IMAGE: Compute drawer - NUC edition vs HR01 edition comparison]


Switch Compartment​

Location: Below compute drawer

All Editions:

  • EnGenius ECS2510FP switch (8-port 2.5G) or ECS5512FP (upgraded)
  • Front-facing RJ45 ports (Ports 1-8)
  • Status LEDs visible
  • Management button accessible

[IMAGE: Switch compartment with port labels]


Front Storage Drawer​

Location: Top drawer, full-depth

📦 NUC Edition:

  • Carbon fiber telescoping pole
  • Ethernet cables (various lengths)
  • Gateway mounting accessories (if equipped)
  • Miscellaneous tools and adapters

🔶 🔷 HR01 Editions:

  • Carbon fiber telescoping pole
  • Ethernet cables (various lengths)
  • Mako 5600 gateway (if equipped with cellular option)
  • Gateway mounting accessories

[IMAGE: Front storage drawer contents - NUC vs HR01 layouts]


Control Panel​

Location: Lower front panel (below drawers)

All Editions:

  • LED control button
  • LED brightness adjustment
  • Status indicators
  • Cooling profile selector (Silent/Balanced/Turbo)

[IMAGE: Control panel closeup with labels]


Rear Panel Components​

When rear lid is removed, you'll see:

[IMAGE: Rear panel overview with labeled components]


Power Distribution Unit (PDU)​

Location: Top center of rear panel

All Editions:

  • EnGenius ECP106 (North America) or ECP106-INT (International)
  • 6× power outlets
  • LCD display showing power consumption
  • Network port for monitoring
  • Physical power switches per outlet

[IMAGE: PDU with labeled outlets and display]


Rear Storage Drawer​

Location: Below PDU, short-depth drawer

📦 NUC Edition:

  • Starlink Mini storage space (compatible)
  • Power cables and adapters
  • Spare hardware and mounting screws
  • Documentation pouches

🔶 HR01-2 Edition:

  • Too short for Starlink Mini
  • Power cables and adapters
  • Spare hardware
  • General accessories

🔷 HR01-4 Edition:

  • Similar to HR01-2 edition
  • Additional cable management

[IMAGE: Rear drawer contents by edition]


Network Connections​

Location: Rear panel, switch access

All Editions:

  • SFP+ ports (Ports 9-10) with copper transceivers
  • Switch uplink connection point
  • Cable pass-throughs to front panel

[IMAGE: Rear network connections]


Internal Shelves (2 Levels)​

The EDC interior contains two storage shelves above the main components.

Access: Remove front lid to view shelves

[IMAGE: Interior view showing both shelf levels]


Top Storage Shelf​

Location: Highest internal shelf

All Editions:

  • T-bar bracket (for gateway mounting)
  • HiveRadar Beacon (if equipped)
  • Cable ties and management accessories
  • Spare antennas (if applicable)
  • Small tools and hardware

[IMAGE: Top shelf contents layout]


Middle Storage Shelf​

Location: Second internal shelf (below top shelf)

📦 NUC Edition:

  • Spare NUC mounting hardware
  • Power supply cables for NUCs
  • Small form-factor accessories
  • NUC-specific documentation

🔶 🔷 HR01 Editions:

  • HR-01 server accessories
  • Additional SFP+ transceivers
  • Server-specific cables
  • HR-01 documentation

[IMAGE: Middle shelf - NUC vs HR01 contents comparison]


Lid Storage​

Both front and rear lids contain storage for support legs and accessories.

[IMAGE: Lid storage overview - both lids]


Front Lid (Lid 1) - EDC Deployment Legs​

Purpose: Stores legs for elevating EDC off ground

Contents:

  • 4× Support legs (angled feet)
  • Marked "EDC" or "Lid 1" inside
  • These legs deploy the EDC in operational mode
  • Legs have angled feet for stability

Identification:

  • Text inside lid: "EDC LEGS"
  • Text inside leg anchor points: "EDC"
  • Leg shape: Angled feet at ends

[IMAGE: Front lid open showing EDC leg storage]


Rear Lid (Lid 2) - Bench Deployment Legs​

Purpose: Stores legs for converting lid to bench seat

Contents:

  • 4× Bench legs (straight profile)
  • Marked "BENCH" or "Lid 2" inside
  • These legs deploy a lid as bench/work surface
  • Legs have straight design

Optional Contents:

  • Carbon fiber extension pole (if equipped)
  • Additional cable lengths
  • Field accessories

Identification:

  • Text inside lid: "BENCH LEGS"
  • Text inside leg anchor points: "BENCH"
  • Leg shape: Straight from top to bottom

[IMAGE: Rear lid open showing bench leg storage and extension pole]


Component Quick Reference Table​

ComponentFront or RearExact LocationAll Editions?
Compute NodesFrontCenter drawer (backlit)✅ Yes (varies by edition)
SwitchFrontBelow compute drawer✅ Yes
Front Storage DrawerFrontTop drawer✅ Yes (contents vary)
Control PanelFrontLower front panel✅ Yes
PDURearTop center✅ Yes
Rear Storage DrawerRearBelow PDU✅ Yes (depth varies)
Network Ports (SFP+)RearRear panel, switch access✅ Yes
Top Shelf (T-bar, beacon)InteriorHighest shelf✅ Yes
Middle ShelfInteriorSecond shelf✅ Yes (contents vary)
EDC LegsFront LidLid storage compartment✅ Yes
Bench LegsRear LidLid storage compartment✅ Yes
Extension PoleRear LidLid storage (optional)⚠️ If equipped
Carbon Fiber PoleFrontTop drawer✅ Yes
Mako GatewayFrontTop drawer⚠️ If equipped (HR01 only)
Starlink Mini SpaceRearShort drawer📦 NUC only

Edition-Specific Summary​

📦 NUC Edition Differences​

Compute:

  • 3× Intel NUC Pro nodes
  • Smaller form factor

Storage:

  • Middle shelf: NUC-specific accessories
  • Rear drawer: Compatible with Starlink Mini

Weight:

  • ~85 lbs (39 kg)

🔶 HR01-2 Edition Differences​

Compute:

  • 2× HR-01 Edge Server nodes
  • Full-depth servers

Storage:

  • Middle shelf: HR-01 server accessories
  • Front drawer: Mako 5600 option (uses same space as Starlink in NUC)
  • Rear drawer: Too short for Starlink Mini

Weight:

  • ~92 lbs (42 kg)

🔷 HR01-4 Edition Differences​

Compute:

  • 4× HR-01 Edge Server nodes
  • High-density configuration

Storage:

  • Middle shelf: HR-01 accessories (more than HR01-2)
  • Similar storage layout to HR01-2

Weight:

  • ~98 lbs (44 kg)

Finding Specific Items​

"Where is the carbon fiber pole?"​

→ Front storage drawer (top drawer)

"Where is the T-bar bracket?"​

→ Top internal shelf

"Where are the bench legs?"​

→ Rear lid storage (marked "BENCH")

"Where is the extension pole?"​

→ Rear lid storage (if equipped)

"Where is the gateway?"​

→ Front storage drawer (HR01 with Mako option) OR store separately if customer-provided

"Where are spare cables?"​

→ Front storage drawer (ethernet cables) AND rear storage drawer (power cables)

"Where is the HiveRadar Beacon?"​

→ Top internal shelf (if equipped)

"Where are the EDC deployment legs?"​

→ Front lid storage (marked "EDC")


Storage Best Practices​

After deployment:

  1. Store lids safely - place removed lids flat in secure location
  2. Keep small items organized - use drawers and shelves as designed
  3. Cable management - coil cables neatly in storage areas
  4. Heavy items low - keep heavier items in drawers (not shelves)
  5. Secure during transport - ensure all items secured before moving

Before transport:

  1. Retract all deployed components (gateway, legs, etc.)
  2. Return items to designated storage
  3. Close and latch all lids securely
  4. Verify nothing loose inside

What's Next?​

After familiarizing yourself with component locations:

📦 NUC Edition Users: 👉 Continue to Part 3: Hardware Installation to install compute nodes

🔶 🔷 HR01 Edition Users: 👉 Skip to Part 4: Software Configuration (your nodes are pre-installed)