Component Locations

Visual reference guide for all EDC components, storage locations, and edition-specific differences.

⏱️ Reference Time: 5 minutes


Overview

This page provides a comprehensive reference for locating all components within your HiveRadar EDC. Use this guide during setup, maintenance, or when looking for specific items.

What's covered:

  • Front and rear panel components
  • Internal component layout (2 shelves)
  • Storage locations in lids
  • Edition-specific differences (NUC vs HR-01)

Front Panel Components

When front lid is removed, you'll see:

[IMAGE: Front panel overview with labeled components]

Compute Drawer

Location: Center, backlit drawer with server nodes

📦 NUC Edition:

  • 3× Intel NUC Pro nodes (side by side)
  • Labeled 1, 2, 3
  • Individual bays with rubber dampening
  • Access via pull handle

🔶 HR01-2 Edition:

  • 2× HR-01 Edge Server nodes
  • Labeled 1, 2
  • Full-depth server chassis
  • Access via pull handle

🔷 HR01-4 Edition:

  • 4× HR-01 Edge Server nodes
  • Labeled 1, 2, 3, 4
  • High-density configuration

Accessing drawers: All drawers (compute and storage) use twist-lock mechanisms on left and right sides. Twist upward ~90° to unlock. For complete drawer operation instructions, see Storage Drawers.

[IMAGE: Compute drawer - NUC edition vs HR01 edition comparison]


Switch Compartment

Location: Below compute drawer

All Editions:

  • EnGenius ECS2510FP switch (8-port 2.5G) or ECS5512FP (upgraded)
  • Front-facing RJ45 ports (Ports 1-8)
  • Status LEDs visible
  • Management button accessible

[IMAGE: Switch compartment with port labels]


Front Storage Drawer

Location: Top drawer, full-depth

📦 NUC Edition:

  • Carbon fiber telescoping pole
  • Ethernet cables (various lengths)
  • Gateway mounting accessories (if equipped)
  • Miscellaneous tools and adapters

🔶 🔷 HR01 Editions:

  • Carbon fiber telescoping pole
  • Ethernet cables (various lengths)
  • Mako 5600 gateway (if equipped with cellular option)
  • Gateway mounting accessories

[IMAGE: Front storage drawer contents - NUC vs HR01 layouts]


Control Panel

Location: Lower front panel (below drawers)

All Editions:

  • LED control button
  • LED brightness adjustment
  • Status indicators
  • Cooling profile selector (Silent/Balanced/Turbo)

[IMAGE: Control panel closeup with labels]


Rear Panel Components

When rear lid is removed, you'll see:

[IMAGE: Rear panel overview with labeled components]


Power Distribution Unit (PDU)

Location: Top center of rear panel

All Editions:

  • EnGenius ECP106 (North America) or ECP106-INT (International)
  • 6× power outlets
  • LCD display showing power consumption
  • Network port for monitoring
  • Physical power switches per outlet

[IMAGE: PDU with labeled outlets and display]


Rear Storage Drawer

Location: Below PDU, short-depth drawer

📦 NUC Edition:

  • Starlink Mini storage space (compatible)
  • Power cables and adapters
  • Spare hardware and mounting screws
  • Documentation pouches

🔶 HR01-2 Edition:

  • Too short for Starlink Mini
  • Power cables and adapters
  • Spare hardware
  • General accessories

🔷 HR01-4 Edition:

  • Similar to HR01-2 edition
  • Additional cable management

[IMAGE: Rear drawer contents by edition]


Network Connections

Location: Rear panel, switch access

All Editions:

  • SFP+ ports (Ports 9-10) with copper transceivers
  • Switch uplink connection point
  • Cable pass-throughs to front panel

[IMAGE: Rear network connections]


Internal Shelves (2 Levels)

The EDC interior contains two storage shelves above the main components.

Access: Remove front lid to view shelves

[IMAGE: Interior view showing both shelf levels]


Top Storage Shelf

Location: Highest internal shelf

All Editions:

  • T-bar bracket (for gateway mounting)
  • HiveRadar Beacon (if equipped)
  • Cable ties and management accessories
  • Spare antennas (if applicable)
  • Small tools and hardware

[IMAGE: Top shelf contents layout]


Middle Storage Shelf

Location: Second internal shelf (below top shelf)

📦 NUC Edition:

  • Spare NUC mounting hardware
  • Power supply cables for NUCs
  • Small form-factor accessories
  • NUC-specific documentation

🔶 🔷 HR01 Editions:

  • HR-01 server accessories
  • Additional SFP+ transceivers
  • Server-specific cables
  • HR-01 documentation

[IMAGE: Middle shelf - NUC vs HR01 contents comparison]


Lid Storage

Both front and rear lids contain storage for support legs and accessories.

[IMAGE: Lid storage overview - both lids]


Front Lid (Lid 1) - EDC Deployment Legs

Purpose: Stores legs for elevating EDC off ground

Contents:

  • 4× Support legs (angled feet)
  • Marked "EDC" or "Lid 1" inside
  • These legs deploy the EDC in operational mode
  • Legs have angled feet for stability

Identification:

  • Text inside lid: "EDC LEGS"
  • Text inside leg anchor points: "EDC"
  • Leg shape: Angled feet at ends

[IMAGE: Front lid open showing EDC leg storage]


Rear Lid (Lid 2) - Bench Deployment Legs

Purpose: Stores legs for converting lid to bench seat

Contents:

  • 4× Bench legs (straight profile)
  • Marked "BENCH" or "Lid 2" inside
  • These legs deploy a lid as bench/work surface
  • Legs have straight design

Optional Contents:

  • Carbon fiber extension pole (if equipped)
  • Additional cable lengths
  • Field accessories

Identification:

  • Text inside lid: "BENCH LEGS"
  • Text inside leg anchor points: "BENCH"
  • Leg shape: Straight from top to bottom

[IMAGE: Rear lid open showing bench leg storage and extension pole]


Component Quick Reference Table

ComponentFront or RearExact LocationAll Editions?
Compute NodesFrontCenter drawer (backlit)✅ Yes (varies by edition)
SwitchFrontBelow compute drawer✅ Yes
Front Storage DrawerFrontTop drawer✅ Yes (contents vary)
Control PanelFrontLower front panel✅ Yes
PDURearTop center✅ Yes
Rear Storage DrawerRearBelow PDU✅ Yes (depth varies)
Network Ports (SFP+)RearRear panel, switch access✅ Yes
Top Shelf (T-bar, beacon)InteriorHighest shelf✅ Yes
Middle ShelfInteriorSecond shelf✅ Yes (contents vary)
EDC LegsFront LidLid storage compartment✅ Yes
Bench LegsRear LidLid storage compartment✅ Yes
Extension PoleRear LidLid storage (optional)⚠️ If equipped
Carbon Fiber PoleFrontTop drawer✅ Yes
Mako GatewayFrontTop drawer⚠️ If equipped (HR01 only)
Starlink Mini SpaceRearShort drawer📦 NUC only

Edition-Specific Summary

📦 NUC Edition Differences

Compute:

  • 3× Intel NUC Pro nodes
  • Smaller form factor

Storage:

  • Middle shelf: NUC-specific accessories
  • Rear drawer: Compatible with Starlink Mini

Weight:

  • ~85 lbs (39 kg)

🔶 HR01-2 Edition Differences

Compute:

  • 2× HR-01 Edge Server nodes
  • Full-depth servers

Storage:

  • Middle shelf: HR-01 server accessories
  • Front drawer: Mako 5600 option (uses same space as Starlink in NUC)
  • Rear drawer: Too short for Starlink Mini

Weight:

  • ~92 lbs (42 kg)

🔷 HR01-4 Edition Differences

Compute:

  • 4× HR-01 Edge Server nodes
  • High-density configuration

Storage:

  • Middle shelf: HR-01 accessories (more than HR01-2)
  • Similar storage layout to HR01-2

Weight:

  • ~98 lbs (44 kg)

Finding Specific Items

"Where is the carbon fiber pole?"

Front storage drawer (top drawer)

"Where is the T-bar bracket?"

Top internal shelf

"Where are the bench legs?"

Rear lid storage (marked "BENCH")

"Where is the extension pole?"

Rear lid storage (if equipped)

"Where is the gateway?"

Front storage drawer (HR01 with Mako option) OR store separately if customer-provided

"Where are spare cables?"

Front storage drawer (ethernet cables) AND rear storage drawer (power cables)

"Where is the HiveRadar Beacon?"

Top internal shelf (if equipped)

"Where are the EDC deployment legs?"

Front lid storage (marked "EDC")


Storage Best Practices

After deployment:

  1. Store lids safely - place removed lids flat in secure location
  2. Keep small items organized - use drawers and shelves as designed
  3. Cable management - coil cables neatly in storage areas
  4. Heavy items low - keep heavier items in drawers (not shelves)
  5. Secure during transport - ensure all items secured before moving

Before transport:

  1. Retract all deployed components (gateway, legs, etc.)
  2. Return items to designated storage
  3. Close and latch all lids securely
  4. Verify nothing loose inside

What's Next?

After familiarizing yourself with component locations:

📦 NUC Edition Users: 👉 Continue to Part 3: Hardware Installation to install compute nodes

🔶 🔷 HR01 Edition Users: 👉 Skip to Part 4: Software Configuration (your nodes are pre-installed)