Part 3: Hardware Installation

Installation procedures for compute nodes, power systems, and cable connections.

Who Needs This Section?​

📦 NUC Edition: NUC kits typically ship WITHOUT compute nodes. Partners or technical users install NUCs before deployment.

🔶 HR01-2 Edition / 🔷 HR01-4 Edition: HR-01 kits ship pre-installed. Read the HR-01 note but skip installation procedures.

Not sure? See Installation Overview to determine if you need hardware installation.

What You'll Accomplish​

By the end of this section, you will have (NUC Edition only):

  • ✅ Installed NUC compute nodes
  • ✅ Mounted power supplies
  • ✅ Connected power and network cables
  • ✅ Verified installation completeness

Time Required​

NUC Edition: 60-90 minutes HR01 Editions: Pre-installed (0 minutes)

Prerequisites​

Before starting hardware installation:

Section Contents​

  1. Installation Overview - Who, when, tools, safety
  2. NUC Installation - 📦 NUC Edition only
  3. HR-01 Note - 🔶 🔷 HR-01 pre-installation note

What Comes Next​