Skip to main content

Part 2: Physical Deployment

Deploy the EDC hardcase into operational configuration.

What You'll Find Here​

This section covers:

  • ✅ Lid operation and safety
  • ✅ Support leg deployment (EDC elevation and bench)
  • ✅ Gateway mounting on telescoping pole
  • ✅ Positioning with proper clearances
  • ✅ Component location reference

Purpose​

Transform your EDC from transport configuration to operational deployment.

This section guides you through all physical setup procedures: opening lids, deploying support legs, mounting wireless gateways, and positioning the EDC for optimal performance.

⏱️ Time Required: 45-60 minutes

Section Contents​

Lid Operation​

Safe operation and use of protective lids.

Leg Deployment​

Deploy EDC elevation legs and optional bench configuration.

Gateway Deployment​

Mount wireless gateway on telescoping pole.

Positioning​

Optimal placement and environmental considerations.

Component Locations​

Visual reference guide for all EDC components.

Prerequisites​

Before using this section:

What's Next?​

After physical deployment:

📦 NUC Edition Users: 👉 Continue to Part 3: Hardware Installation to install compute nodes

🔶 🔷 HR01 Edition Users: 👉 Skip to Part 4: Software Configuration (your nodes are pre-installed)