Part 2: Physical Deployment
Deploy the EDC hardcase into operational configuration.
What You'll Find Here
This section covers:
- ✅ Lid operation and safety
- ✅ Support leg deployment (EDC elevation and bench)
- ✅ Gateway mounting on telescoping pole
- ✅ Positioning with proper clearances
- ✅ Component location reference
Purpose
Transform your EDC from transport configuration to operational deployment.
This section guides you through all physical setup procedures: opening lids, deploying support legs, mounting wireless gateways, and positioning the EDC for optimal performance.
⏱️ Time Required: 45-60 minutes
Section Contents
Lid Operation
Safe operation and use of protective lids.
Leg Deployment
Deploy EDC elevation legs and optional bench configuration.
Gateway Deployment
Mount wireless gateway on telescoping pole.
Positioning
Optimal placement and environmental considerations.
Component Locations
Visual reference guide for all EDC components.
Prerequisites
Before using this section:
- ✅ Getting Started reviewed
- ✅ Part 1: Box Contents completed
- ✅ All components verified present
- ✅ Workspace cleared with adequate space
What's Next?
After physical deployment:
📦 NUC Edition Users: 👉 Continue to Part 3: Hardware Installation to install compute nodes
🔶 🔷 HR01 Edition Users: 👉 Skip to Part 4: Software Configuration (your nodes are pre-installed)