HR-01 Pre-Installation Note

Understanding default pre-installation for HR-01 editions.

⏱️ Read Time: 2 minutes


Overview

🔶 HR01-2 Edition and 🔷 HR01-4 Edition systems ship with compute nodes already installed.

This is a brief reference note explaining what was completed by default. You do not need to perform these installation steps.


What Was Pre-Installed

By default

Your HR-01 edition EDC was assembled and tested before shipping:

Compute nodes:

  • HR-01 Edge Server nodes mounted in compute drawer
  • Securely fastened with appropriate hardware
  • Positioned and aligned for optimal cooling

Power connections:

  • Power cables connected from PDU to each node
  • Power harnesses routed and secured
  • Cable management completed

Network connections:

  • Ethernet cables connected from switch to each node
  • RJ45 connections: 2× per node
  • SFP+ connections: 2× per node (HR-01 models)
  • Cables routed via keystone panel
  • All connections labeled

System testing:

  • Power-on test performed
  • Network connectivity verified
  • Basic functionality confirmed
  • System powered down for shipping

What You Should Know

Component Layout

HR01-2 Edition:

  • 2× HR-01 Edge Server nodes in compute drawer
  • Nodes labeled 1 and 2
  • Identical mounting and connection method

HR01-4 Edition:

  • 4× HR-01 Edge Server nodes in compute drawer
  • Nodes labeled 1, 2, 3, and 4
  • High-density configuration

Access:

  • Open front lid to view compute drawer
  • Pull drawer handle to slide out for inspection
  • Do not remove nodes unless performing service

[IMAGE: HR-01 nodes in compute drawer - HR01-2 vs HR01-4]


Physical Installation Details

If you need to understand the physical installation (for future service or replacements):

Mounting:

  • HR-01 nodes mount similarly to NUC installation
  • Larger form factor (full-depth servers vs compact NUCs)
  • Secured with mounting screws
  • Cooling clearances maintained

Power:

  • Each node connects to PDU via power cable
  • PDU outlets numbered and labeled
  • Power distribution pre-balanced

Network:

  • 2× RJ45 connections per node (to switch ports)
  • 2× SFP+ connections per node (with copper transceivers included)
  • Pre-wired through keystone panel on rear
  • All keystone jacks labeled for tracing

Process is similar to NUC installation with adaptations for HR-01 form factor. See NUC Installation for general installation concepts (mounting, cabling method, etc.).


When You Might Need This Information

Service Scenarios

You might need to understand the installation if:

Component replacement:

  • Failed HR-01 node needs replacement
  • Upgrading to higher-capacity node
  • Warranty service required

Troubleshooting:

  • Inspecting connections
  • Verifying proper installation
  • Diagnosing hardware issues

Differences from NUC Installation

Key differences between HR-01 and NUC editions:

AspectNUC EditionHR-01 Editions
Shipping stateNodes NOT installedNodes PRE-installed
Node count3× NUCs2× or 4× HR-01 servers
Form factorCompact NUCHigher storage and compute capacity servers
Installation requiredYes (partner/technical user)No (by default complete)
Power connections3× cables2× or 4× cables
Network connections2× RJ45 per node2× RJ45 + 2× SFP+ per node
CoolingPassive + EDC fansActive (server fans) + EDC fans

What You Should Do Instead

Since your HR-01 edition is pre-installed:

Skip hardware installation and proceed directly to:

👉 Power & Startup - Power on the system

Then continue through:


Support and Documentation

For HR-01 specific information:

  • StorMagic SvHCI documentation (if using StorMagic)
  • Contact your reseller/partner for technical questions

What's Next?

HR-01 edition users should proceed to:

👉 Power & Startup - Connect power and perform first boot