Part 4: Software Configuration
Configure all software systems and network connectivity.
What You'll Find Here
This section covers:
- ✅ Power-on procedures and startup sequence
- ✅ Network configuration (switch, PDU, uplinks)
- ✅ HCI software setup and cluster initialization
- ✅ IoT monitoring and sensor configuration
- ✅ Optional component configuration
Purpose
Configure and initialize all software systems for operation.
This section guides all users through powering on the EDC, configuring network infrastructure, setting up the HCI cluster, and enabling monitoring systems. This is required for all editions.
⏱️ Time Required: 2-4 hours
Section Contents
Power and Startup
Power connection, PDU configuration, and boot sequence.
Network Configuration
Switch setup, port assignments, and uplink connectivity.
HCI Software
Hyperconverged infrastructure setup and cluster initialization.
IoT Monitoring
Environmental sensors, GPS, and monitoring systems.
Optional Components
Gateway configuration, Starlink, and additional accessories.
Prerequisites
Before using this section:
All users:
- ✅ Getting Started reviewed
- ✅ Part 1: Box Contents completed
- ✅ Part 2: Physical Deployment completed
NUC edition users ONLY:
- ✅ Part 3: Hardware Installation completed
- ✅ All compute nodes installed
HR01 edition users:
- ✅ Skip Part 3 (nodes pre-installed)
What's Next?
After software configuration:
👉 Continue to Part 5: Operations for daily operations and maintenance